More accomplished: Longitudinal went into the bow section, bonded and taped, 'floor' on top of that, also bonded and taped. Starting to feel really solid in that area now. Bow sprit support tube bonded in place, now needs a good rub down and clean-up after my messy filling. Support tube needs taping in next.
As we're now going to have an adjustable forestay, (this should give us more control of the rig as we've no backstay) we need to concentrate a little more on more structure in the bow area. The support tube will help for the compression loads we're expecting.
No comments:
Post a Comment